Abstract
This paper describes a parameter optimization of the JLC positron source design by detailed particle tracking simulations. The design parameters are modified from those of the previous JLC design study, considering the energy-density limit of the converter-target damage and the recent change in the specifications, especially the twice increase of a charge intensity of a beam pulse. It is shown that a multiple target system to share the deposition energy is inevitable and at least three targets are necessary to yield sufficient positrons within the energy-density limit.
Original language | English |
---|---|
Pages | 3288-3290 |
Number of pages | 3 |
Publication status | Published - 2003 Dec 1 |
Externally published | Yes |
Event | PAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference - Portland, OR, United States Duration: 2003 May 12 → 2003 May 16 |
Other
Other | PAC 2003 - Proceedings of the 2003 IEEE Particle Accelerator Conference |
---|---|
Country/Territory | United States |
City | Portland, OR |
Period | 03/5/12 → 03/5/16 |
ASJC Scopus subject areas
- Engineering(all)