N2 - A reduction of the maintenance cost and an improvement of utilization in facilities have been performed by introducing Condition-Based Maintenance (CBM) to nuclear power plants since the 1980s in USA. In Japan, also, maintenance methods combined with TBM (Time-Based Maintenance) and CBM have a tendency to be applied. In the present work, an estimation and optimization model for extending TBM time interval is developed considering spurious diagnosis of measuring devices in the maintenance method combined with TBM and CBM. Using the present model, the life time of applied measuring devices can be estimated in order to prolong the time interval of TBM execution and satisfy the required one. Moreover, TBM time interval can be given for minimizing the maintenance cost under the condition of the target safety. From a sensitivity analysis of the parameters including the present model, it is clarified that leaving the facilities in an abnormal state has the largest effect on the cost of damage for the maintenance.
AB - A reduction of the maintenance cost and an improvement of utilization in facilities have been performed by introducing Condition-Based Maintenance (CBM) to nuclear power plants since the 1980s in USA. In Japan, also, maintenance methods combined with TBM (Time-Based Maintenance) and CBM have a tendency to be applied. In the present work, an estimation and optimization model for extending TBM time interval is developed considering spurious diagnosis of measuring devices in the maintenance method combined with TBM and CBM. Using the present model, the life time of applied measuring devices can be estimated in order to prolong the time interval of TBM execution and satisfy the required one. Moreover, TBM time interval can be given for minimizing the maintenance cost under the condition of the target safety. From a sensitivity analysis of the parameters including the present model, it is clarified that leaving the facilities in an abnormal state has the largest effect on the cost of damage for the maintenance.
KW - Combined TBM and CBM
KW - Life time of measuring devices
KW - Maintenance method
KW - Minimizing maintenance cost
KW - Spurious diagnosis
KW - State transition model
KW - TBM time interval
UR - http://www.scopus.com/inward/record.url?scp=36148934485&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=36148934485&partnerID=8YFLogxK
U2 - 10.3327/taesj.J06.030
DO - 10.3327/taesj.J06.030
M3 - Article
AN - SCOPUS:36148934485
SN - 1347-2879
VL - 6
SP - 312
EP - 319
JO - Transactions of the Atomic Energy Society of Japan
JF - Transactions of the Atomic Energy Society of Japan
IS - 3
ER -