TY - JOUR
T1 - How should river embankments be spatially developed, from the upstream section or the downstream section?
AU - Koma, Taisei
AU - Kono, Tatsuhito
AU - Kazama, So
N1 - Funding Information:
Ministry of Education, Culture, Sports, Science and Technology, Grant/Award Number: 21K18128 Funding information
Funding Information:
We are grateful to grants from the Ministry of Education, Culture, Sports, Science and Technology, Government of Japan (Grant-in-Aid for Scientific Research 21K18128). Despite assistance from many sources, any errors in the paper remain the sole responsibility of the authors.
Publisher Copyright:
© 2022 The Authors. Journal of Flood Risk Management published by Chartered Institution of Water and Environmental Management and John Wiley & Sons Ltd.
PY - 2023/3
Y1 - 2023/3
N2 - Using an economic model of how river embankments affect local residents, we explore the efficiency of embankment construction from two viewpoints: (1) which section of a river should be constructed first, the upstream or downstream section, and (2) how tall the embankments should be constructed depending on the section. For this purpose, we first develop a model to determine efficient construction of embankments using a hydraulic model. Then, we perform numerical simulations, which are calibrated with recorded ground data for the Kitakami and Abukuma Rivers. The results reveal that the construction from the upstream section can be efficient if the upstream section has a much larger population than the downstream section. We show that constructing higher embankments in the upstream section generates negative externalities in the downstream section because it increases the possibility of flooding in the downstream section. In addition, when the amount of inflow from tributaries into the downstream section is sufficiently large compared to that into the upstream section, embankments with efficient heights bring about Pareto improvements, giving benefit to residents in the downstream section as well as the upstream section. Moreover, we show that the efficient embankment heights depend on which section the construction starts from.
AB - Using an economic model of how river embankments affect local residents, we explore the efficiency of embankment construction from two viewpoints: (1) which section of a river should be constructed first, the upstream or downstream section, and (2) how tall the embankments should be constructed depending on the section. For this purpose, we first develop a model to determine efficient construction of embankments using a hydraulic model. Then, we perform numerical simulations, which are calibrated with recorded ground data for the Kitakami and Abukuma Rivers. The results reveal that the construction from the upstream section can be efficient if the upstream section has a much larger population than the downstream section. We show that constructing higher embankments in the upstream section generates negative externalities in the downstream section because it increases the possibility of flooding in the downstream section. In addition, when the amount of inflow from tributaries into the downstream section is sufficiently large compared to that into the upstream section, embankments with efficient heights bring about Pareto improvements, giving benefit to residents in the downstream section as well as the upstream section. Moreover, we show that the efficient embankment heights depend on which section the construction starts from.
KW - cost–benefit analysis
KW - flood control planning
KW - kinematic wave method
KW - river embankments
KW - spatial developments
UR - http://www.scopus.com/inward/record.url?scp=85142602911&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85142602911&partnerID=8YFLogxK
U2 - 10.1111/jfr3.12870
DO - 10.1111/jfr3.12870
M3 - Article
AN - SCOPUS:85142602911
SN - 1753-318X
VL - 16
JO - Journal of Flood Risk Management
JF - Journal of Flood Risk Management
IS - 1
M1 - e12870
ER -