Status of 1.54 GeV ATF linac

Seishi Takeda, H. Hayano, M. Akemoto, T. Naito, H. Matsumoto, J. Urakawa, K. Oide, N. Terunuma, K. Kubo, R. Hinode, T. Korhonen, Y. Funahashi, S. Araki, S. Kashiwagi, T. Okugi

Research output: Contribution to conferencePaperpeer-review

Abstract

Accelerator Test Facility (ATF) consists of a 1.54 GeV S-band linac, a beam transport line, a damping ring and an extraction beam line. A beam commissioning of the linac was performed in November 1995. A single bunch and multi-bunch beam were accelerated up to 1.43 GeV at the end of the beam transport line. The beam experiments on high-gradient acceleration, structure BPM and multi-bunch energy compensation were performed after the beam commissioning. The operation of the linac was suspended from April 1996 for the construction of the damping ring. The operation of the linac was restarted from December 1996, and the beam commissioning of the damping ring was carried out in January 1997.

Original languageEnglish
Pages587-589
Number of pages3
Publication statusPublished - 1998
EventProceedings of the 1997 17th Particle Accelerator Conference, PAC-97 - Vancouver, BC, CAN
Duration: 1997 May 121997 May 16

Conference

ConferenceProceedings of the 1997 17th Particle Accelerator Conference, PAC-97
CityVancouver, BC, CAN
Period97/5/1297/5/16

Fingerprint

Dive into the research topics of 'Status of 1.54 GeV ATF linac'. Together they form a unique fingerprint.

Cite this